Barnsley Library – Barnsley

A new state-of-the-art library has opened in the centre of Barnsley as the “cornerstone” of a £180m regeneration project.

The four-storey library is situated in the Lightbox building, which has a transparent glass exterior designed to illuminate Barnsley’s new town square.

Each of the floors provide digital services including cutting-edge virtual reality, a training suite with a 65-inch interactive touch screen and tablet computers.

Fully accessible, it also includes a sanctuary room for people with autism and will host a music and memories group supported by the Alzheimer’s Society, designed for people living with dementia and their carers.

Project Summary

Control Panels – 1No (Form 2)

Controllers – Trend IQ4E, IQVIEW4 Display

Front End PC – IQ Vision

Plant Controlled/Monitored – Gas Proving, Pressurisation Unit, Boilers, CT Pumps, VT Pumps, CHW Pumps, CHW Pressurisation Unit, Chiller, CWS Booster, Water Conditioner, Packaged AHU, Packaged Kitchen Vent, Toilet Vent, Trench Heating, DX Units

Integration – Electric Meters (Modbus), Packaged AHU (BACNet/IP), Packaged Kitchen Vent (BACNet/IP)

Customer

NPS Ltd