Britvic – Rugby

A number of extensions, covering 8,000 m2, have been built which allows Britvic to replace two of the existing production lines with one single line that provides the equivalent output, but with significant energy savings and waste reduction.

The construction works also help to strengthen Britvic’s position in the UK soft drinks market by creating space for the installation of two new robotic manufacturing lines, enabling the site’s production capacity to be increased by 25% to 120,000 cans per hour.

 

 

Project Summary

Control Panels – 1No. (Form 2)

Controllers – Trend IQ4E, IQVIEW4 Display

Plant Controlled/Monitored – Heat Recovery Units. AHU, DX Units, Extract Ventilation, Intrinsically Safe Barriers

Customer

Harris CM