Installation of a new production line , syrup room and cleaning room.
Extension of 6,700 m2 to the existing production warehouse, new syrup room and effluent treatment plant
A number of extensions, covering 8,000 m2, have been built which allows Britvic to replace two of the existing production lines with one single line that provides the equivalent output, but with significant energy savings and waste reduction. The construction works also help to strengthen Britvic’s position in the UK soft drinks market by creating space for the installation of two new robotic manufacturing lines, enabling the site’s production capacity to be increased by 25% to 120,000 cans per…
The cooling tower was installed as part of a factory upgrade to provide heat rejection for the process cooling system.
The Rotork UK manufacturing and operation centre in Leeds supplies actuation solutions and services support to companies throughout the UK and Ireland. The modern 7,450 square metre facility houses Rotork Gears and Rotork Fluid Systems manufacturing, is a Rotork Group stocking centre and is also the headquarters for Rotork Gears and Rotork UK Ltd.