Eightlands District Heating – Dewsbury

The project involved the design and installation of 2MW (500kW Herz BioMatic with v-profile aluzinc prefabricated fuel store plus 1.5MW high efficiency gas back up boilers) of heating power for a central plant room. The biomass boiler and gas provision can both be controlled centrally for the 180 residential homes meaning a constant supply of heat can be maintained if there is an issue with either the gas or biomass equipment.

Read More >

Adel Beck Secure Unit – Leeds

Built on the site of the former Eastmoor Secure Children’s Unit the new unit has replaced the out-dated existing buildings, creating 24 bedrooms, a teaching block, a canteen, leisure facilities and administrative space. In conformity with government guidelines, the accommodation is a single-storey building with top priority accorded to security and surveillance measures.

Read More >

South Yorkshire Police Custody Suite – Sheffield

The purpose-built facility on Shepcote Lane near Meadowhall includes a fifty-cell custody suite replacing the existing suites in Ecclesfield, Moss Way, Sheffield city centre and Rotherham. The site also houses the services that wrap around a police investigation with investigative officers and partner agencies working from the same building. For example, health and social services staff will be on site working with those who commit crime to address the causes of their criminal behaviour in order to reduce further…

Read More >

South Yorkshire Police Custody Suite – Barnsley

The 20-cell suite is located on Churchfield as part of the Barnsley Headquarters building, replacing the existing suite on the site. The new environment is safer, more cost effective and brings better conditions for those using and working in the suite. The new suite in Barnsley forms part of a £19m project to improve custody facilities across South Yorkshire.

Read More >