Eightlands District Heating – Dewsbury

The project involved the design and installation of 2MW (500kW Herz BioMatic with v-profile aluzinc prefabricated fuel store plus 1.5MW high efficiency gas back up boilers) of heating power for a central plant room.

The biomass boiler and gas provision can both be controlled centrally for the 180 residential homes meaning a constant supply of heat can be maintained if there is an issue with either the gas or biomass equipment.

 

 

 

Project Summary

Control Panels – 1No. (Form 2)

Trend Controllers – IQ3, IQVIEW4 Display, GSM Modem

Plant┬áControlled – Biomass Boiler, LTHW Boilers, Pumps (Packaged Inverters), Plate Heat Exchanger