IKEA – Sheffield

Work on the project began in late 2016 after Clugston Construction secured the contract to work on the 340,000 sq ft flagship store.

The IKEA Sheffield store, the 20th in the UK, has created over 480 jobs in a wide range of roles including customer relations, contact centre, sales, interior design and in the IKEA restaurant.

IKEA Sheffield is the retailer’s most sustainable store to date and has achieved a BREEAM* ‘excellent’ accreditation. The design incorporates a number of sustainable technologies including photovoltaic panels and rainwater harvesting as part of the store’s commitment to achieving 100% renewable energy by 2020.

The store is also equipped with electric vehicle charging points on site providing renewably generated power for EV vehicles.

Project Summary

Control Panels – 5No. (Form 2)

Controllers – Trend IQ4E, IQECO, IQVIEW8 Display

Front End PC – 963 Supervisor (Maintenance & Security)

Plant Controlled/Monitored – LTHW Boilers, Pumps (Packaged Inverters), HWS Heaters, CWS Booster & Tanks, Chillers, Fan Coil Units, AHU’s, General Extract Ventilation

Integration – Chillers (Modbus), Fan Convectors (Modbus), CRAC Units (Modbus), Electric Meters (Modbus), Energy Meters (M-Bus)

Customer

Norstead M & E Ltd