Commercial

Tower Works Leeds

Now part of the Holbeck Urban Village regeneration project, Tower Works is undergoing redevelopment to become a residential village. There will be two new residential buildings with one, two and three-bedroom built to rent apartments and duplexes. Three new public squares are planned around each of the site’s iconic chimneys.

​

Project Summary

​

Controllers – IQ4E

Customer - G & H Building Services

Chesterfield Waterside is an innovative and sustainable £340 million scheme and is currently the 47th largest regeneration project in the UK. The development has risen from the remains of the old Trebor factory and is a major mixed-use regeneration programme to the immediate north of the town centre.

​

Project Summary

 

Control Panels – 1No (Form2)

Controllers – IQ4E, IQVIEW4 Display

Front End PC – N/A

Plant Controlled/Monitored – Pressurisation Unit, VRF, ASHP, CT Pumps, Toilet Extract Fans, CWS Tanks & Booster, HRU’s, Trace Heating, AOV’s, Underfloor Heating, Water Meters

Integration – Electric Meters (Modbus), ASHP (BACNet/IP), VRF (BACNet/IP)

Customer - H E Barnes Ltd.

Reading International Business Park

Plans have been submitted to turn Reading International Business Park into the premier office location on the M4 corridor.

​

Project Summary

​

Control Panels – 8No (Form 1 – IP65 GRP), 2No (Form 2), 10No (Form 1)

Controllers – IQ4E, IQVIEW4 Displays

Front End PC – IQ Vision

Plant Controlled/Monitored – AHU’s, VAV Units, Electric RHB’s Electric Trench Heating, LTHW Trench Heating, Toilet Extract Fan, Door Curtains, ASHP’s, Primary/Secondary LTHW Pumps, VRF, HRU’s, General Extract Fans

Integration – Electric Meters (Modbus), ASHP (BACNet/MSTP), VRF (BACNet/IP)

Customer - Sale Service & Maintenance Ltd.

Merrion House is a 170,000 sq ft state of the art office building let for 25 years to Leeds City Council. It has all of the Council’s public facing departments and houses circa 2,200 employees. The redevelopment has transformed a 1970’s office block into an innovative public sector building and has facilitated a significant decrease in Leeds City Councils’ costs.

​

Project Summary

 

Control Panels – 5No. (Form 1)

Controllers – Trend IQ4E

Front End PC – Trend 963 Supervisor

Plant Controlled/Monitored – CWS Boosters & Tanks, Heat Recovery Units, Packaged AHU’s, Gas Booster, DX Units, Overdoor Heaters, Floor Isolation Dampers

Integration – Electric Meters (Modbus), Packaged AHU’s (BACNet/IP), Lighting System (BACNet/IP) (Mode 5 Smoke/Fire Damper System)

Control Panels – 1No. (Form 1)

Controllers – Trend IQ4E

Customer - BAM Construction Ltd

CONTACT

Inquiries

For any inquiries or questions, please call: 0113 279661 or fill out the following form

Contact Us

Thanks for submitting!

Head Office

Calverley Control Installations Ltd
Blacup House
Royds Close
Leeds
West Yorkshire
LS12 6LL

Contact info

Tel: 0113 279 6611

General Enquiries : info@calverleycontrols.co.uk
Sales Enquiries : sales@calverleycontrols.co.uk

bottom of page